Annual production capacity is 88,040,000 kWh

The total installed power of Kalecik Hydroelectric Power Plant in Artvin, owned by Dağlar Enerji Elektrik Üretim A.Ş. operating under Metgün Energy, is 28.06 MWm, and its annual generation capacity is 88,040,000 kWh.

The carbon certification process for Kalecik HEPP plant is continuing at the Global Carbon Council (GCC).

Project Name

Kalecik HEPP

City / District of the Project

Merkez- Artvin

Installed Capacity (MWm)

28,06

Turbine

Dikey Pelton / Andritz Hydro

Number of turbines

2

Generator

2 x Indar (6300 Volt, 14241 kVA)

Annual Energy Production (kWh)

88.040.000